ISO 23467:2020

Ice plug isolation of piping in nuclear power plant

General information
Valid from 01.12.2020
Directives or regulations
None

Standard history

Status
Date
Type
Name
01.12.2020
Main
This document specifies requirements for the ice plug technique with liquid nitrogen or dry ice as refrigerant (cryogenic medium) on metal pipes of nuclear power plants. The freezing liquid can be water or water mixture (e.g. boric acid mixture).
This document specifies technical requirements of ice plug generation, formation judgment and removal, measures before, during and after ice plugging and requirements for personnel and non-destructive testing.
The application of the ice plug isolation technique is principally not allowed on cladded pipes or pipes with internal coatings. The application for pressure test is not in the scope of this document and will be qualified separately.
*
*
*
PDF
125.87 € incl tax
Paper
125.87 € incl tax
Standard monitoring