Skip to main content
Back

ISO 5124:2024

Loading and unloading of liquefied natural gas (LNG) tank wagons and containers

General information

Valid from 01.10.2024
Directives or regulations
None

Standard history

Status
Date
Type
Name
01.10.2024
Main
This document provides requirements and recommendations for the design, construction and operation of newly installed liquefied natural gas (LNG) railway loading and unloading facilities for use on onshore LNG terminals, LNG satellite plants, handling LNG tank wagons or tank containers engaged in international trade.
The designated boundary limits of this document are between the LNG terminal’s inlet/outlet piping headers at the beginning of the rail loading or unloading area and the rail track area used for LNG tank wagons and containers. It is applicable to all rail loading bays, weighbridge(s) and related subsystems.

Required fields are indicated with *

*
*
*
PDF
125.87 € incl tax
Paper
125.87 € incl tax
Standard monitoring