Back

IWA 33-3:2021

Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements

General information
Valid from 16.03.2021
Directives or regulations
None

Standard history

Status
Date
Type
Name
16.03.2021
Main
This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.
Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.
*
*
*
PDF
254.36 € incl tax
Paper
254.36 € incl tax
Standard monitoring