Skip to main content
Back

Sorry - this product is no longer available

prEN 12599

Ventilation for buildings - Test procedures and measurement methods to hand over air conditioning and ventilation systems and air conditioning systems for non-residential buildings

General information

Draft
Base Documents
prEN 12599
Directives or regulations
None
You can view draft standards in the Commenting portal🡭.

Standard history

Status
Date
Type
Name
Main
prEN 12599
06.11.2012
Main
This document specifies checks, measurement methods and procedures in order to verify the fitness for purpose of the installed ventilation systems and air conditioning systems according to design.
It establishes a procedure intended to technically support the handing over and inspection of these systems.
This document enables the choice between checks and measurements when sufficient, and additional measurements, when necessary.
This document applies to mechanical ventilation systems (including the mechanical part of hybrid systems) and full and (partial) air conditioning systems in non-residential (parts of) buildings.
This document does not apply to:
—  heat generating systems and their control;
—  refrigerating systems and their control;
—  distribution of heating and cooling medium to the air handling units;
—  compressed air supplying systems;
—  water conditioning systems;
—  central steam generating systems for air humidifying;
—  electric supply systems.
This document is not applicable to ventilation systems and air conditioning systems for industrial or other special process environments.

Required fields are indicated with *

*
*
*
Standard monitoring