Skip to main content
Back

CLC/TR 50624:2014

Railway applications - Functional Interface Specification - Pantograph System

General information

Valid from 04.08.2014
Base Documents
CLC/TR 50624:2014
Directives or regulations
None

Standard history

Status
Date
Type
Name
04.08.2014
Main
This Technical Report is covering the description of the pantograph system and the functional interface between the pantograph system itself and the TCMS, including the context of multiple units.
The pantograph system contains the pantograph and the pantograph control. The internal interface between pantograph and pantograph control is not in the scope of this document.

Required fields are indicated with *

*
*
*
*
PDF
27.28 € incl tax
Paper
27.28 € incl tax
Browse standard from 2.48 € incl tax
Standard monitoring