Skip to main content
Back

EVS-EN 12699:2015

Execution of special geotechnical works - Displacement piles

General information

Valid from 08.06.2015
Base Documents
EN 12699:2015
Directives or regulations
None

Standard history

Status
Date
Type
Name
08.06.2015
Main
01.06.2001
Main
1.1  This European Standard establishes general principles for the execution of displacement piles, that means piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave and/or limiting vibration as well as removal of obstructions or to assist penetration.
Piles are driven into the ground using impact, vibration, pressing, screwing or a combination of these methods.
1.2  The material of displacement piles covered by this European Standard can be:
-  steel;
-  cast iron;
-  concrete, mortar;
-  timber;
-  grout;
-  combination of above.
1.3  This European Standard covers prefabricated, cast in situ, or a combination of these methods to form displacement piles of regular shape.
Examples are given in Figure A.2 and Figure A.3.
1.4  Displacement piles may be installed in soils enhanced by ground improvement techniques. The ground improvement can be executed before, at the same time or after installation of the piles.
1.5  Other than practical considerations there are for the purpose of this European Standard no limitations regarding cross section dimensions, shaft or base enlargements, length or rake.
1.6  The provisions of this European Standard apply to:
-  single piles;
-  pile groups;
-  concrete sheet piles.
1.7  Columns constructed by ground improvement techniques (such as mixed in situ columns, jet grouting, compaction grouting, vibro flotation, stone columns) are not covered by this European Standard. Bored piles are covered in EN 1536. Steel and timber sheet pile walls are covered in EN 12063. Micropiles are covered in EN 14199.

Required fields are indicated with *

*
*
*
PDF
31.72 € incl tax
Paper
31.72 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 14199:2015

Execution of special geotechnical works - Micropiles
Newest version Valid from 08.06.2015
Main

EVS-EN 1537:2013

Execution of special geotechnical work - Ground anchors
Newest version Valid from 05.08.2013
Main + amendment

EVS-EN 1536:2010+A1:2015

Execution of special geotechnical work - Bored piles
Newest version Valid from 03.12.2015
Main

EVS-EN 12063:2001

Execution of special geotechnical work - Sheet-pile walls
Newest version Valid from 01.07.2001