Back

EVS-EN 15632-3:2022

District heating pipes - Factory made flexible pipe systems - Part 3: Non bonded system with plastic service pipes; requirements and test methods

General information
Valid from 01.06.2022
Base Documents
EN 15632-3:2022
Directives or regulations
None

Standard history

Status
Date
Type
Name
01.06.2022
Main
04.02.2015
Main + amendment
This document specifies requirements and test methods for flexible, factory made, buried district heating pipe systems with plastic service pipes and no bonding between the layers of the pipe assemblies.
It is only applicable in conjunction with part 1.
This document is applicable to pipes, fittings, their joints and to joints with components made of non-plastics materials intended to be used for district heating installations.
This document is applicable to a maximum operating temperature of 95 °C and maximum operating design pressure up to 1,0 MPa for a design service life of at least 30 years.
This document does not apply to cover surveillance systems.
NOTE  For higher temperatures or for the transport of other fluids, for example potable water, additional requirements and testing is needed. Such requirements are not specified in this document.
*
*
*
PDF
15.86 € incl tax
Paper
15.86 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 15632-1:2022

District heating pipes - Factory made flexible pipe systems - Part 1: Classification, general requirements and test methods
Newest version Valid from 01.06.2022
Main

EVS-EN 15632-4:2022

District heating pipes - Factory made flexible pipe systems - Part 4: Bonded system with metal service pipes; requirements and test methods
Newest version Valid from 17.05.2022
Main

EVS-EN 15632-2:2022

District heating pipes - Factory made flexible pipe systems - Part 2: Bonded system with plastic service pipes; requirements and test methods
Newest version Valid from 01.06.2022
Main + amendment

EVS-EN 13941-2:2019+A1:2021

District heating pipes - Design and installation of thermal insulated bonded single and twin pipe systems for directly buried hot water networks - Part 2: Installation
Newest version Valid from 31.12.2021