EVS-EN 16907-3:2018

Earthworks - Part 3: Construction procedures

General information

Valid from 19.12.2018
Base Documents
EN 16907-3:2018
Directives or regulations
None

Standard history

Status
Date
Type
Name
19.12.2018
Main
This European Standard provides execution procedures for excavating, transporting and placing soils
and rocks for the construction of earth-structures and guidance for the work. Additionally, it includes
excavation and placement of rock materials underwater.
Dredging of soils and the associated hydraulic placement of fills are covered by EN 16907-6 and
EN 16907-7.
Execution of earthworks follows the conclusions of the earthworks design and optimization phase
(EN 16907-1), which should anticipate soil and rock specificities and their suitability. In case some events
could not be foreseen, additional design is performed during the execution of works.

Required fields are indicated with *

*
*
*
PDF
39.04 € incl tax
Paper
39.04 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 16907-1:2018

Earthworks - Part 1: Principles and general rules
Newest version Valid from 19.12.2018
Main

EVS-EN 16907-5:2018

Earthworks - Part 5: Quality control
Newest version Valid from 19.12.2018
Main

EVS-EN 16907-2:2018

Earthworks - Part 2: Classification of materials
Newest version Valid from 19.12.2018
Main

EVS-EN 16907-4:2018

Earthworks - Part 4: Soil treatment with lime and/or hydraulic binders
Newest version Valid from 19.12.2018