Back

EVS-EN 50518-1:2013

Monitoring and alarm receiving centre -- Part 1: Location and construction requirements

General information
Withdrawn from 02.09.2019
Base Documents
EN 50518-1:2013
Directives or regulations
None

Standard history

Status
Date
Type
Name
02.09.2019
Main
09.12.2013
Main
07.06.2010
Main
EVS-EN 50518-1:2010
This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.
This part of EN 50518 is to be read in conjunction with Part 2 and Part 3, and cannot be used separately.
*
*
*
PDF
19.52 € incl tax
Paper
19.52 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 50518-2:2013

Monitoring and alarm receiving centre -- Part 2: Technical requirements
Withdrawn from 02.09.2019
Main

EVS-EN 50518-3:2013

Monitoring and alarm receiving centre -- Part 3: Procedures and requirements for operation
Withdrawn from 02.09.2019
Main

EVS-EN 1873:2014

Prefabricated accessories for roofing - Individual rooflights of plastics - Product specification and test methods
Withdrawn from 02.03.2016
Main

EVS-EN 1522:2003

Windows, doors, shutters and blinds - Bullet resistance - Requirements and classification
Newest version Valid from 21.01.2004