Back

EVS-EN 60909-3:2010

Short-circuit currents in three-phase a.c systems -- Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth

General information
Valid from 06.05.2010
Base Documents
IEC 60909-3:2009; EN 60909-3:2010
Directives or regulations
None

Standard history

Status
Date
Type
Name
This part of IEC 60909 specifies procedures for calculation of the prospective short-circuit currents with an unbalanced short circuit in high-voltage three-phase a.c. systems operating at nominal frequency 50 Hz or 60 Hz, i. e.: a)  currents during two separate simultaneous line-to-earth short circuits in isolated neutral or resonant earthed neutral systems;  b)  partial short-circuit currents flowing through earth in case of single line-to-earth short circuit in solidly earthed or low-impedance earthed neutral systems. The currents calculated by these procedures are used when determining induced voltages or touch or step voltages and rise of earth potential at a station (power station or substation) and the towers of overhead lines.
*
*
*
PDF
28.06 € incl tax
Paper
28.06 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 60909-0:2016

Short-circuit currents in three-phase a.c. systems - Part 0: Calculation of currents
Newest version Valid from 05.07.2016
Main

EVS-EN 60865-1:2012

Short-circuit currents - Calculation of effects - Part 1: Definitions and calculation methods
Newest version Valid from 03.05.2012
Main

IEC TR 60909-1:2002

Short-circuit currents in three-phase a.c. systems - Part 1: Factors for the calculation of short-circuit currents according to IEC 60909-0
Newest version Valid from 31.07.2002
Main

IEC TR 60909-2:2008

Short-circuit currents in three-phase a.c. systems - Part 2: Data of electrical equipment for short-circuit current calculations
Newest version Valid from 13.11.2008