Back

EVS-EN IEC 61936-1:2021

Power installations exceeding 1 kV AC and 1,5 kV DC - Part 1: AC (IEC 61936-1:2021)

General information
Valid from 15.11.2021
Base Documents
IEC 61936-1:2021; EN IEC 61936-1:2021
Directives or regulations
None

Standard history

Status
Date
Type
Name
Amendment
EN IEC 61936-1:2021/prAA:2024
15.11.2021
Main
09.12.2014
Amendment
09.12.2014
Main + amendment
05.03.2013
Corrigendum
05.04.2011
Corrigendum
05.01.2011
Main + corrigendum
This part of IEC 61936 provides requirements for the design and the erection of electrical power
installations in systems with nominal voltages exceeding 1 kV AC and nominal frequency up to
and including 60 Hz, so as to provide safety and proper functioning for the use intended.
For the purpose of interpreting this document, an electrical power installation is considered to
be one of the following:
a) substation, including substation for railway power supply;
b) electrical power installations on mast, pole and tower, switchgear and/or transformers
located outside a closed electrical operating area;
c) one (or more) power station(s) located on a single site, the electrical power installation
includes generators and transformers with all associated switchgear and all electrical
auxiliary systems. Connections between generating stations located on different sites are
excluded;
d) the electrical system of a factory, industrial plant or other industrial, agricultural, commercial
or public premises;
e) electrical power installations on offshore facilities for the purpose of generation,
transmission, distribution and/or storage of electricity;
f) transition towers/poles (between overhead lines and underground lines).
The electrical power installation includes, among others, the following equipment:
– rotating electrical machines;
– switchgear;
– transformers and reactors;
– converters;
– cables;
– wiring systems;
– batteries;
– capacitors;
– earthing systems;
– buildings and fences which are part of a closed electrical operating area;
– associated protection, control and auxiliary systems;
– large air core reactor.
NOTE 1 In general, equipment standards take precedence over the requirements of this document.
This document does not apply to the design and erection of any of the following:
– overhead and underground lines between separate electrical power installations;
– electrified railway tracks and rolling stock;
– mining equipment and installations;
– fluorescent lamp installations;
– installations on ships according to IEC 60092 (all parts) and offshore units according to
IEC 61892 (all parts), which are used in the offshore petroleum industry for drilling,
processing and storage purposes;
– electrostatic equipment (e.g. electrostatic precipitators, spray-painting units);
– test sites;
– medical equipment, e.g. medical X-ray equipment.
This document does not apply to the design of prefabricated, type-tested switchgear and high
voltage/low voltage prefabricated substation, for which separate IEC standards exist.
NOTE 2 The scope of this document does not include the requirements for carrying out live working on electrical
power installations.
NOTE 3 The scope of this document considers safety requirements for HV installations and the influences of HV
installations on LV installations. For electrical installations up to 1 kV, IEC 60364 (all parts) applies.
*
*
*
PDF
39.04 € incl tax
PDF redline
50.75 € incl tax
Paper
39.04 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 50522:2022

Earthing of power installations exceeding 1 kV a.c.
Newest version Valid from 01.04.2022
Main

EVS-EN 50341-2-20:2018

Overhead electrical lines exceeding AC 1 kV - Part 2-20: National Normative Aspects (NNA) for Estonia (based on EN 50341-1:2012)
Newest version Valid from 19.12.2018
Main + corrigendum

EVS-EN 50341-1:2013

Overhead electrical lines exceeding AC 1 kV - Part 1: General requirements - Common specifications
Newest version Valid from 07.10.2013
Main + corrigendum

EVS-HD 60364-5-53:2022

Low-voltage electrical installations - Part 5-53: Selection and erection of electrical equipment - Switchgear and controlgear
Newest version Valid from 03.10.2022