Skip to main content
Back

EVS-EN IEC 62271-110:2018

High-voltage switchgear and controlgear - Part 110: Inductive load switching

General information

Withdrawn from 02.05.2023
Base Documents
IEC 62271-110:2017; EN IEC 62271-110:2018
Directives or regulations
None

Standard history

Status
Date
Type
Name
02.05.2023
Main
02.04.2018
Corrigendum
15.02.2018
Main
04.01.2013
Main
EVS-EN 62271-110:2012
IEC 62271-110:2017 is applicable to AC switching devices designed for indoor or outdoor installation, for operation at frequencies of 50 Hz and 60 Hz on systems having voltages above 1 000 V and applied for inductive current switching. It is applicable to switching devices (including circuit-breakers in accordance with IEC 62271-100) that are used to switch high‑voltage motor currents and shunt reactor currents and also to high-voltage contactors used to switch high-voltage motor currents as covered by IEC 62271-106. This fourth edition cancels and replaces the third edition published in 2012 and constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
- all switching devices are now covered, not only circuit-breakers;
- a limited number of T10 tests no longer covers shunt-reactor switching tests below 52 kV;
- evaluation and reporting of a re-ignition-free arcing time window has been added.

Required fields are indicated with *

*
*
*
PDF
24.40 € incl tax
Paper
24.40 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 1776:2015

Gas infrastructure - Gas measuring systems - Functional requirements
Newest version Valid from 05.01.2016
Main

EVS-EN 12186:2014

Gas infrastructure - Gas pressure regulating stations for transmission and distribution - Functional requirements
Newest version Valid from 09.12.2014
Main

EVS-EN 12583:2014

Gas infrastructure - Compressor stations - Functional requirements
Withdrawn from 01.06.2022
Main

EVS-EN 16348:2013

Gas infrastructure - Safety Management System (SMS) for gas transmission infrastructure and Pipeline Integrity Management System (PIMS) for gas transmission pipelines - Functional requirements
Withdrawn from 16.08.2022