Skip to main content
Back

Sorry - this product is no longer available

prEN IEC 60728-101-2:2022

Performance requirements for signals delivered at the system outlet in operation with alldigital channels load

General information

Draft
Base Documents
100/3804/CDV; prEN IEC 60728-101-2:2022
Directives or regulations
None

Standard history

Status
Date
Type
Name
Main
prEN IEC 60728-101-2:2022
This part of IEC 60728 provides the minimum performance requirements to be fulfilled in operation at the system outlet or terminal input and describes the summation criteria for the impairments present in the received signals and those produced by the CATV/MATV/SMATV cable network, including individual receiving systems. NOTE 1 When a change of signal format is made at the headend, the summation of the impairments does not apply (see also Clause 6). In a building divided into apartment blocks, the signals received by the antennas are distributed by the MATV/SMATV cable network up to the home network interface (HNI); the television signals are then distributed (inside the home) by home networks (HN) of various types up to the system outlet or terminal input. The cable network can support two way operation, from the system outlet (or terminal input) towards the headend. The home network can use coaxial cables, balanced pair cables, fibre optic cables (glass or plastic) and also wireless links inside a room (or a small number of adjacent rooms) to replace wired cords. This part of IEC 60728 is limited to downstream TV broadcast signals received from antennas and is applicable to cable networks intended for television signals, sound signals and interactive services operating between about 5 MHz and 3 300 MHz. The frequency range is extended to 6 000 MHz for home distribution techniques that replace wired cords with a wireless two-way communication inside a room (or a small number of adjacent rooms) that uses the 5 GHz to 6 GHz frequency band. Figure 1 shows the main sections of a general CATV/MATV/SMATV system, indicating the parts of the IEC 60728-101 series documents where the relevant performance requirements are indicated. • The requirements for the signals received at the headend are given in Clause 6 of IEC 60728-101. • The requirements for the CATV/MATV/SMATV cable network, assuming an unimpaired input signal at the input of the headend, up to the system outlet are given in IEC 60728-101, Clause 5. • The requirements for the CATV/MATV/SMATV cable network up to the home network interface (HNI) are given in IEC 60728-101, Clause 7, assuming an unimpaired input signal at the input of the headend. • The specific requirements from HNI to the system outlet or terminal input are given in IEC 60728-101-1, Clause 5, assuming an unimpaired input signal at the HNI. • The requirements at the system outlet in operation are given in Clause 6 of this document. The expression “in operation” means that the received signals, with their impairments, are applied to the headend input of the CATV/MATV/SMATV cable network. The requirements at the system outlet “in operation” are derived, therefore, by summing the impairments of the various cascaded parts of the system and of the input signal. When a change of signal format from digital to digital (e.g. from QPSK to QAM) (e.g. as in ETSI EN 300473) or from digital to analogue (e.g. from DVB-S/S2 to AM-VSB or DVB-T/T2 to AM VSB) is made at the headend, the summation of the impairments that produce a relaxation of requirements at system outlet does not apply. Such a case will be the equivalence of unimpaired signals applied at the headend input. Therefore, the requirements at system outlet given in IEC 60728-1 apply. Diagram of the main sections of a CATV/MATV/SMATV cable network and the relevant parts of the IEC 60728-101 series where the requirements are indicated. This document also provides references for the basic methods of measurement of the operational characteristics of the downstream cable network in order to assess its performance. All requirements refer to the performance limits to be achieved in operation at any system outlet when terminated in a resistance equal to the nominal load impedance of the system, unless otherwise specified. Where system outlets are not used, the above applies to the terminal input. NOTE 2 If the home network is subdivided into a number of parts, using different transmission media (e.g. coaxial cabling, balanced cabling, optical cabling, wireless links) the accumulation of degradations should not exceed the figures given below. NOTE 3 Performance requirements of return paths as well as special methods of measurement for the use of the return paths in cable networks are described in IEC 60728-10.

Required fields are indicated with *

*
*
*
PDF
8.84 € incl tax
Paper
8.84 € incl tax
Standard monitoring