Tagasi

EVS-EN IEC 63132-1:2020

Guidance for installation procedures and tolerances of hydroelectric machines - Part 1: General aspects

Üldinfo
Kehtiv alates 15.06.2020
Alusdokumendid
EN IEC 63132-1:2020; IEC 63132-1:2020
Tegevusala (ICS grupid)
27.140 Hüdroenergeetika
Direktiivid või määrused
puuduvad
Standardi ajalugu
Staatus
Kuupäev
Tüüp
Nimetus
15.06.2020
Põhitekst
The purpose of this guide is to establish, in a general way, suitable procedures and tolerances for the installation of hydroelectric turbines and generators. This guide presents a typical assembly. It should be recognized that there are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse and delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. The guide excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. The tolerances in this guide have been established upon Best Practices and experience, although it is recognized that other standards are specifying different tolerances. Wherever the guide specifies that documents, drawings or information shall be supplied by a manufacturer (or by manufacturers), each individual manufacturer shall be required to furnish the appropriate information for their own supply only.
*
*
*
PDF
15,86 € koos KM-ga
Paber
15,86 € koos KM-ga
Hind: 2,40 € koos KM-ga
Standardi monitooring