Back

IEC TS 61400-26-2:2014

Wind turbines - Part 26-2: Production-based availability for wind turbines

General information
Withdrawn from 29.05.2019
Directives or regulations
None

Standard history

Status
Date
Type
Name
04.06.2014
Main
IEC TS 61400-26-2:2014 provides a framework from which production-based performance indicators of a wind turbine generator system can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators. The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation. This document also includes informative annexes with:
- examples of determination of lost production,
- examples of algorithms for production-based indicators,
- examples of other performance indicators,
- examples of application scenarios.
*
*
*
PDF
354.01 € incl tax
Paper
354.01 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

EVS-EN 12464-2:2014

Light and lighting - Lighting of work places - Part 2: Outdoor work places
Newest version Valid from 01.07.2014
Main

EVS-EN 60034-30-1:2014

Rotating electrical machines - Part 30-1: Efficiency classes of line operated AC motors (IE code)
Newest version Valid from 01.07.2014
Main + corrigendum

EVS-EN 62271-202:2014

High-voltage switchgear and controlgear - Part 202: High-voltage/low-voltage prefabricated substation
Withdrawn from 01.09.2022
Main

EVS-EN 16247-2:2014

Energy audits - Part 2: Buildings
Withdrawn from 01.09.2022