Skip to main content
Back

prEN IEC 62196-3:2024

Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 3: Dimensional compatibility requirements for DC and AC/DC pin and contact-tube vehicle couplers

General information

Draft
Base Documents
23H/551/CDV; prEN IEC 62196-3:2024
Directives or regulations
None

Standard history

Status
Date
Type
Name
This part of IEC 62196 is applicable to vehicle couplers with pins and contact tubes of standardized configuration, herein also referred to as "accessories", intended for use in electric vehicle conductive charging systems which incorporate control means, with rated operating voltage and current in accordance with IEC 62196-1:2022.
This document applies to high power DC interfaces and combined AC/DC interfaces of vehicle couplers that are intended for use in conductive charging systems for circuits specified in IEC 61851-1:2017 and IEC 61851-23.
This document applies to accessories and cable assemblies that employ
– thermal sensing, or
– thermal transport and thermal sensing with the system architecture described in CCC.4.100 of Annex CCC.
The DC vehicle connectors and inlets covered by this document are used only in charging mode 4, according to IEC 61851-1:2017, 6.2.4, and case C, as shown in IEC 61851-1:2017, Figure 3.
These vehicle couplers are intended to be used for circuits specified in IEC 61851-23:— which operate at different voltages, and which can include ELV and communication signals.
This document applies to the vehicle couplers to be used in an ambient temperature between –30 °C and +40 °C.
NOTE 1 In some countries, other requirements may apply.
NOTE 2 In the following country, −40 °C applies: SE.
These vehicle couplers are intended to be connected only to cables with copper or copper-alloy conductors.
These accessories are intended to be connected to cables according to the IEC 62893 series for DC cables.

Required fields are indicated with *

*
*
*
PDF
42.70 € incl tax
Paper
42.70 € incl tax
Standard monitoring