Back

CLC/TS 50549-1:2015

Requirements for generating plants to be connected in parallel with distribution networks - Part 1: Connection to a LV distribution network above 16 A

General information
Withdrawn from 15.02.2019
Base Documents
CLC/TS 50549-1:2015
Directives or regulations
None

Standard history

Status
Date
Type
Name
15.02.2019
Main
04.02.2015
Main
The purpose of this Technical Specification is to provide technical guidance on the requirements for generating plants which can be operated in parallel with a distribution network.
For practical reasons, this Technical Specification refers to the distribution system operator in case settings have to be defined and/or provided, even when these settings are to be defined and/or provided by another actor according to national and European legal framework.
NOTE 1  This includes European network codes and their national implementation, as well as further national regulations.
NOTE 2  Further national requirements especially for the connection to the distribution network and the operation of the generating plant can apply.
The requirements of this Technical Specification apply to all generating plants, electrical machinery and electronic equipment, irrespective of the kind of primary energy source and irrespective of the presence of loads in the producer’s network that meet all of the following conditions:
-  converting any primary energy source into AC electricity;
-  connected to a LV distribution network and rated at more than 16 A per phase;
-  intended to operate in parallel with this distribution network under normal network operating conditions.
NOTE 3  Generating plants rated up to and including 16 A per phase are covered by EN 50438.
NOTE 4  Generating plants connected to a MV distribution network fall into the scope of CLC/TS 50549-2.
Unless stated differently by the DSO generating plants connected to a medium voltage distribution network with a maximum apparent power up to 100 kVA can comply with this Technical Specification as alternative to the requirements of CLC/TS 50549-2. A different threshold may be defined by the DSO.
This Technical Specification defines connection requirements.
This Technical Specification recognizes the existence of National Standards, Network Codes, and specific technical requirements of the DSOs. These should be complied with.
Excluded from the scope are:
-  the selection and evaluation of the point of connection;
-  power system impact assessment;
-  connection assessment;
-  island operation of generating plants, both intentional and unintentional, where no part of the distribution network is involved;
-  active front ends of drives feeding energy back into the distribution network for short duration;
-  requirements for the safety of personnel as they are already adequately covered by existing European Standards.
*
*
*
PDF
23.18 € incl tax
Paper
23.18 € incl tax
Browse standard from 2.44 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

CLC/TS 50549-2:2015

Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network
Withdrawn from 15.02.2019
Main

EVS-HD 60364-7-712:2016

Low-voltage electrical installations - Part 7-712: Requirements for special installations or locations - Photovoltaic (PV) systems
Newest version Valid from 03.05.2016
Main

EVS-EN 50438:2013

Requirements for micro-generating plants to be connected in parallel with public low-voltage distribution networks
Withdrawn from 15.02.2019
Main

EVS-EN 50465:2015

Gas appliances - Combined heat and power appliance of nominal heat input inferior or equal to 70 kW
Newest version Valid from 04.03.2015