prEN 1991-1-6

Eurocode 1 - Actions on structures - Part 1-6: Actions during execution

General information

Draft
Base Documents
prEN 1991-1-6
Directives or regulations
None

Standard history

Status
Date
Type
Name
05.03.2013
Corrigendum
01.06.2009
Main
10.08.2005
Main + national annex
1.1  Scope of prEN 1991-1-6
(1) prEN 1991-1-6 provides guidance and general rules on the determination of actions relevant for the design of buildings and civil engineering works, including geotechnical structures, for their execution stage.
NOTE  Actions for design during execution include those that only arise from execution activities and act during execution, termed construction actions (for example personnel and hand tools, auxiliary structures, equipment and elements used during execution), and others that are present during the service life of the completed structure (for example self-weight, wind, etc.) but which can act differently and/or have different values during execution.
(2) prEN 1991-1-6 provides guidance and general rules for the determination of actions for the design of auxiliary structures, elements and equipment used during execution in case they are designed to the Eurocodes and not to other European Standards.
NOTE  Other European Standards (e.g. EN 12810, EN 12811, EN 12812) provide specific rules for certain types of auxiliary structures, equipment and elements used during execution.
(3) prEN 1991-1-6 gives rules for buildings and bridges during execution to supplement the provisions in EN 1990.
NOTE  For combination rules for execution, see EN 1990.
1.2  Assumptions
(1) The general assumptions given in EN 1990 apply.
(2) The application of this document follows the limit state principle and is based on the partial factor method, unless explicitly prescribed differently.
(3) The verification of buildings and civil engineering structures in transient design situations is undertaken in accordance with the Eurocodes, accounting for the interaction with any auxiliary structures, elements and/or equipment.
(4) When using European product standards covering auxiliary structures, equipment and elements used during execution, it is assumed that the design basis, design requirements and, if provided, the safety and operational design limits specified in these product standards are taken into account.
(5) Adequate planning, documentation, communication, control and supervision are provided during execution, involving all relevant parties.
NOTE  Execution of a structure can involve interaction between several parties from diverse engineering fields, responsible for the design, fabrication, transportation and execution of different subsystems used during the execution of a structure.

Required fields are indicated with *

*
*
*
PDF
9.76 € incl tax
Paper
9.76 € incl tax
Standard monitoring

Customers who bought this item also bought

Main

prEN 1991-1-4

Eurocode 1 - Actions on structures - Part 1-4: Wind actions
Newest version Draft
Main

prEN 1994-1-1

Eurocode 4 - Design of composite steel and concrete structures - Part 1-1: General rules and rules for buildings
Newest version Draft